Red Mountain Energy - Minnibai Cryogenic Facility
Gas Liquids Engineering Ltd. (GLE) completed process design, basic, and FEED engineering for a 45 MMSCF/d cryogenic facility to separate nitrogen, sales gas, and C2+ products from a mixed stream of these components. The plant embodies a relatively simple two (2) tower design, without the need of external refrigeration, with effective nitrogen rejection, high purity sales gas, and 95-99% recovery of ethane in the C2+ stream. Installed equipment included:
- Sales Gas Compression: Two (2) 3000 kW (6 kV, 50 Hz) Cameron Superior WH75 3-stage, 6-throw reciprocating compressors
- C2+ Compression and liquefaction: Two (2) 600 kW (6 kV, 50 Hz) Cameron Superior RAM 54 three-stage four-throw reciprocating compressors
- 6 MW Total plant design capacity supplied at 6000 V / 400 V / 220 V @ 50 Hz
- New control room, MCC building, compressor building, instrument air / ventilation building, and turboexpander building. All buildings were constructed on site instead of shop built.
"Decades of Expertise Driving Innovative Engineering Solutions"
Building Smarter Energy Infrastructure
To engineer reliable, forward-thinking energy solutions with safety, sustainability, and client value at the core of everything we do.
- Fast Project Delivery
- Cost-Effective Solutions
Gas Liquids Engineering Ltd. is a multi-disciplinary engineering firm specializing in oil & gas, power generation, and industrial facility solutions. With a strong focus on safety, sustainability, and technical excellence, we deliver tailored engineering, procurement, and project management services across North America and globally. Trusted by industry leaders, GLE combines innovation and proven expertise to power complex projects from concept to completion.
Gas Liquids Engineering (GLE)